ART-ZJL is a tunnel grouting material, used in the crown grouting construction with formwork, is composed of cement, mineral admixtures, fine aggregates, and admixtures, which are uniformly mixed in a certain proportion. After mixing with water, it exhibits excellent fluidity, pumpability, and non-segregation properties. Once hardened, it has a slight expansion characteristic and good bonding performance with the lining concrete.
Main Characteristics
Good fluidity and pumpability
No segregation and bleeding
Slight expansion
Rapid early strength development
High bond strength
Water resistance and durability
Applications
Crown Grouting with Formwork for Tunnel Lining
Physical and chemical indicator
Items |
Performance |
Appearance |
Grey |
Moisture Conten |
0.1 |
Chloride ion content |
2 |
Construction Process
The grouting material slurry should be mixed with water at a water-to-material ratio of 0.18. The mixing time should not be less than 3 minutes.
After the grouting material slurry is thoroughly mixed, the discharge valve of the mixing tank should be opened to allow the slurry to flow quickly into the storage tank. The discharge valve of the mixing tank should then be closed immediately, and grouting should be carried out promptly.
During grouting, the sequential grouting method should be adopted. It is recommended to use a digital pressure gauge. The pressure gauge of the grouting machine should have a range of 10 MPa with an accuracy not lower than 0.2 MPa; the pressure gauge below the grouting valve should have a range of 4 MPa with an accuracy not lower than 0.1 MPa.
When grouting through grouting holes, the process should be carried out in sequence. When the grouting hole that has not been grouted yet discharges slurry with the same density as that in the mixing machine's storage tank, and the pressure gauge below the grouting valve reaches 1.0 MPa, the grouting should be switched to the next hole, and the current hole should be sealed. Grouting is completed when all grouting holes have been grouted and the density of the slurry discharging from the highest point of the end formwork is consistent with that in the mixing tank.
After grouting is completed and the grouting connectors are replaced or removed, the pre-embedded grouting pipes should be sealed promptly. The slurry inside the pre-embedded grouting pipes should be full to prevent leakage.
Packaging
In bags,25kg/bag
Storage
When stored in the original sealed packaging under normal temperature (5~40°C) and dry conditions, the product has a shelf life of 6 months.